Main stages of repair works in the apartment.

0
33

How to start repair works in the apartment?

The initial stage in the repair of old apartments could be the destruction and dismantling to begin with the dilapidated walls and partition walls, detaching the wall and ceiling coating. This stage is considered the most “dirty” stages in the repair.

Another probably the most important and “dusty” works could be the window block substitute. It is important to accomplish this to start with because dirt and dust will probably be unallowable during following stages that is prohibited whatsoever to start home home windows photo during painting and wallpaper works (large drops in the temperature and moisture are unallowable). After mounting home home windows and windowsills you need to take along them immediately in polyethylene film also to cover windowsills furthermore with the fiberboard (to prevent scratches).

The following stage is wiring. Wiring might be placed in walls or over the floor. Wiring is produced inside the pipes to make certain electrical safety while growing reliability. The pipe protects wiring from exterior damages and enables to switch the wire completely getting to interrupt walls and floor simply by inserting the completely new wire rather in the old one.

House Painting follows the wiring. The frequent mistake through the synchronised performing of those works happens when workers forget to place out one of the cables and house painters have formerly plastered and smoothed the wall. Consequently, additional works are needed to close chases round the finished wall. The places in the feed switch and wall plug location in addition to their number ought to be thought-ahead of time. The program of power wiring is usually incorporated to the design project.

Later on the device must expect you’ll service in situation of failures. Furthermore for the wirings, the telephone cable as well as the TV cable are organized. The power cable should not be organized near to the telephone and antenna cables to avoid noise pickup and interference. Most likely probably the most peculiar moment is lounging the television cable. To create two (or three) Televisions inside the apartment the second cable is often simply “firmly soldered” in parallel, and so the cable resistance is decreased. Consequently, the look quality is deteriorated, many programs cannot be received and etc. To avoid such situation you need to ask an expert with special equipment. He’ll look at the signal amount of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is regarded as the extended-term process, for this reason it’s conducted concurrently in many premises, whether it’s possible. Delays are connected with we have got we’ve got the technology. Each applied layer in the plaster (or completing finishing) must dry completely before the work continues.

Works in sanitary plans as well as the kitchen begin concurrently with house painting. It is advisable to satisfy so-referred to as “dirty” works to start with and concurrently. In compliance while using plan in the sanitary specialist location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators aren’t installed.kitchen photo

Then works in sanitary plans are conducted in line with the plan. The bathtub is mounted, then walls are smoothed out as well as the tile is laid on walls. The following stage is assembling ceiling and lounging tiles on the floor. And finally other sanitary devices, mixers and accessories are mounted.

After wiring, installing rosette plates and terminal boxes the present is checked in many point. Ends of wiring are insulated and arranged into rosette plates. Sockets and breakers aren’t set up in this stage in order to save their surface appearance. The final outcome puttying of walls is transported out concurrently. The technologically exact control of drying in the layer in the plaster (filling) is transported out by drymeter. It is a special instrument that measures moisture in the material.

The following stage is the method of fill. Fill could be produced with assorted materials – from usual masonry cement-sand mixture to self-aligning floors. The advantage of the easy mixture is its cheapness, the disadvantage is always that such mixture will be a lot harder aligned within the level as well as the final dry time period of such fill is 40 days, only your next phase in the use floor might be conducted, i.e. time is just too extended. Self-leveling self-aligning floors tend to be pricey, but more technological. Aligning occurs almost “instantly” i.e. fluid solution of mixture is defined out, it runs and you also obtain the horizontal surface. The best dry time is 15 days i.e. you’ve significant time economy. The device “warm floor” is installed to the fill. Once the so-referred to as “wet processes” are inapplicable we have got we’ve got the technology in the dry aligning (the fill technology) may be used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are positioned up. Installing doorways need to take to the account thickness of future flooring. After installation the entrance are easy to remove its hinges and removed prior to the finish of repair or packed into polyethylene film to guard from damages. Concurrently ceiling might be colored as well as the tile might be laid because premises where it absolutely was planned. The tile ought to be laid round the absolutely dry overlay.door boxes photo

Finishing in the floor mounting is determined by the planned covering. Generally (if finish covering is not the tile) fill is incorporated by bitumen mastic and plywood sheets are laid. They are fixed for the floor by self-tapping screws. One plywood sheet is bound by 30-50 self-tapping screws to provide the close fixing of plywood and extended-term service in the floor without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After mounting in the plywood is finished, wallpaper for painting might be pasted on walls.

In premises where finish covering in the floor is laminated flooring or parquet hoard, the conventional wallpapers are pasted (not for painting) to start with. Your flooring is mounted.

If finish covering in the floor could be the block parquet, the parquet is laid to start with, then it is crawled and incorporated in a single layer of lacquer. After this the conventional wall-papers are pasted as well as the parquet is trained in rest layers of lacquer (with regards to the company’s parquet and lacquer). The stated consequence is expounded simply with such scrambling process when the lot of dust is created. Whatever the truth so good floor grinders are outfitted while using vacuum, the sufficient volume of dust is precipitated on surrounding subjects including walls. Dust is very acerbic which is badly washed off. For this reason so they won’t break wallpapers, they are pasted after scrambling plus order the parquet don’t absorb the additional moisture it’s trained in a single layer of lacquer before wallpaper pasting.

After this the main works may very well be to get finished. It’s left only to install the plinths, decorative elements, breakers and sockets, curtain holders, to carry doorways, plant-bands while others.

To summarize you need to spot the sequence of works was listed in general and could change with regards to the definite situation – the quantity of rooms in premise, your sources, peculiarities of the building of the multilevel premises. It is founded on sense and every person in a position to analysis can individually create this kind of sequence.